Paving Results in Detour of Westbound Deerfield Road on 9/1/2016

Tomorrow, September 1, the contractor will place concrete pavement on Deerfield Road between Waukegan Road and Rosemary Terrace from noon to 6 p.m. Due to the limited space available, the contractor will be required to detour the westbound traffic around this operation while maintaining the eastbound traffic flow. The detour route will be Rosemary Terrace to Orchard Street (as shown in the below map). Detour signage will be installed and the contractor will have multiple flaggers onsite to help with any congested areas due to this detour.

CONSTRUCTION FORECAST TEMPLATE deerfield rd PAVING westbound detour

OVERALL PROGRESS: 98% Completed