%PM, %07 %867 %2016 %14:%Sep

Paving Results in Detour of Westbound Deerfield Road on 9/8/2016

Tomorrow, September 8, the contractor will place concrete pavement on Deerfield Road between Rosemary Terrace and Kenton Road from 11 a.m. to 6 p.m. Due to the limited space available, the contractor will detour the westbound traffic around this operation while maintaining the eastbound traffic flow. The detour route will begin at Oxford Road and signage will be installed to direct motorists along the detour route. The contractor will have multiple flaggers onsite to help with any congested areas due to this detour.

OVERALL PROGRESS: 98% Completed

98%